Hydrants

Inspection i.a According to DIN 14462, 14818, 14811, 14461-1 and BetrSichV

Download Checklists

Included templates / checklists: Hydrants operator inspection, above and underground hydrants, wall hydrant

Download free sample protocols for the inspection of hydrants here. Reduce your inspection effort by up to 70% by performing the inspection with CHEQSITE ‘s lean apps. Further information…

Checklist / Template

Example: Wall Hydrant – Inspection acc. to DIN 14818 / DIN 14811 / DIN 14461-1

Attributes

  • Location
  • Manufacturer / Supplier
  • Type
  • Year of build

Components

  • Operating device e.g. steel tube
  • Seals / Coupling seals
  • Pressure measuring device and display elements
  • Pressure hose

Functional check

  • Reel in particular for even water flow, mobility
  • Resting pressure maximum 7 bar
  • Hose flow pressure test with existing operating pressure
  • Hose flow pressure test with maximum operating pressure (type w 16 bar / type c 12 bar)

Maintenance

Follow sequence

  • Empty the hose (wash and dry)
  • Replace damaged or malfunctioning parts
  • Affix proof of maintenance
  • Establish operational readiness

Hydrants Sample Template Checklist

Online Seminars

For all those who do not yet have a smartphone or tablet in operation, we offer free online seminars in which we explain how to use the CHEQSITE apps in a clear and concise manner. You are also welcome to invite your colleagues, who also perform inspections or post-process inspection reports, to the online seminars. We are looking forward to a cooperation.